SDCCD Mesa College:
7/28/2010

Color photo: Forklift truck transporting large I-beam up steep incline to top of hillside - Embedded text: 7/28/10
Color photo: Worker attaching cable from crane to end of I-beam - Embedded text: 7/28/10
Color photo: Worker standing aside large I-beam vertically suspended from crane - Embedded text: 7/28/10
Color photo: Forklift truck transporting large I-beam up steep incline to top of hillside - Embedded text: 7/28/10
Color photo: Worker standing aside large I-beam vertically suspended from crane - Embedded text: 7/28/10
Color photo: Worker attaching cable from crane to end of I-beam - Embedded text: 7/28/10
Color photo: Workman and crane operator positioning suspended I-beam above open posthole - Embedded text: 7/28/10
Color photo: Workman and crane operator loading suspended I-beam into open posthole - Embedded text: 7/28/10
B/W photo: Workman and crane operator near completing loading of suspended I-beam into open posthole  - Embedded text: 7/28/10
Color photo: I-beam pier, of future retaining wall, implanted in posthole - Embedded text: 7/28/10
Color photo: Tracked excavator transporting loaded concrete bucket up steep incline to top of hillside  - Embedded text: 7/28/10
Color photo: Worker empting concrete bucket into I-beam post hole - Embedded text: 7/28/10

Addendums

Color photo: Construction of large retaining wall begins - Embedded text: 8/30/10
Color photo: Construction of large retaining wall continues; old retaining wall has been removed - Embedded text: 9/16/10
Color photo: Construction of large retaining wall nears completion - Embedded text: 10/13/10